Start date
March-2015
Budget
397.5 Crores
The project involves the rehabilitation and upgradation of the Rudhauli to Basti side approach of the Ghaghra Bridge Section [Km. 65+870 to Km. 122+270] of NH-233 in Uttar Pradesh. It was designed to convert the existing road into a two-lane configuration with a paved shoulder on an EPC(Engineering,Procurement, and Construction) mode under NHDP Phase-IV. The initiative aimed to improve transportation efficiency and regional connectivity.