Start date
16.12.2022
Budget
₹33.95 Crore
This project involves the development of a 4/6 lane road section on NH-205AG, extending from Mohali (Design Ch. 0+000) to Sirhind (Design Ch. 27+370), covering a total design length of 27.370 km. The work is part of the Bharatmala Pariyojana initiative in Punjab, aimed at improving road infrastructure and traffic flow between these two towns. The project is being executed in a joint venture between VCL and VCIPL (JV) under the Engineering, Procurement, and Construction (EPC) mode, focusing on enhancing connectivity and road safety.